How quickly can I get a chiller or cooler?

Applied Thermal Control design, assemble, test, and dispatch all units from our factory located in Barrow upon Soar, United Kingdom. All Applied Thermal Control units are built to order. We work closely with UK based suppliers and equipment manufacturers to prove re-circulating chillers, water-to-water heat exchangers and air blast coolers designed for optimised performance and reliability.

Please be advised that addition of options is likely to increase the lead time. Applied Thermal Control have a small fleet of loan units available. Examples of when these may be used include:

  • Urgent cover required following a breakdown
  • To meet a temporary cooling requirement
  • For use when the primary cooling circuit is under repair and water to water cooled units are usually used
  • To compensate for longer lead times when waiting for a new unit
  • To qualify/test whether a system will be suitable for the requirements of an application
  • To quantify cooling capacity.

In emergency situations, we are often able to expedite production. After a discussion regarding your requirements, your salesperson will provide you with further details of any adjustments to the lead times displayed below.

Following this time, you will receive confirmation of shipping from our administration team.

Model Lead Time
K-Series 4 weeks
 M-Series  4 weeks
R-Series 4 weeks
XR-Series 4 weeks
 A-Series Within 6 weeks
XF-Series  Within 6 weeks
W-Series Within 6 weeks
F-Series  Within 10 weeks